Among the most energy-intensive public institutions are the more than 1,000 hospitals in Ukraine with a total of around 430,000 beds. (GIZ_FactSheet_EE%20Hospitals_EN_final_web.pdf)

Due to the large number of different medical specialties in hospitals and the resulting differences in equipment and use, energy consumption sometimes varies greatly from hospital to hospital.

The heating of buildings accounts for a considerable part of the energy consumption of hospitals. Therefore, it is recommended to pay special attention to heat losses through the building envelope. Hot water consumption and heat losses vary from hospital to hospital.

Significant consumers of electricity in hospitals are, among others, the lighting system, specific medical equipment, laundry facilities and ventilation equipment.

Classification:

6 floors and more

Building construction period: 1978 - 1988

Heated area, m2: 9854

Heated space, m3: 29563

Number of floors: 6

Wall: Brick wall

U-value: 1,2

Roof or ceiling: Flat roof, partly with attic

U-value: 0,67

Ground: Basement

U-value: 0,756

Windows: PVC (100%)

U-value: 2,22

Doors: Wooden (96%), PVC (4%)

U-value: 2,94

Heating system: District heating, 2-pipe system, unbalanced

Domestic hot water: Centralized DHW

Renovation level I

Renovation Level 1 consists of measures, the implementation of which results in energy efficiency class of level "C"

Thermal insulation of walls (150 mm)

Replacement of old windows

Thermal insulation of attic floors (200 mm)

Thermal insulation of flat roofs (250 mm)

Thermal insulation of ground floor (100 mm)

Individual heating substation

Hydraulic balancing (installation of balancing valves)

Thermal insulation of heat distribution pipes

Renovation level II

Renovation Level 2 consists of measures, the implementation of which achieves in energy efficiency class of level "B"

Thermal insulation of walls (200 mm)

Replacement of old windows

Replacement of old doors

Thermal insulation of attic floors (250 mm)

Thermal insulation of flat roofs (300 mm)

Thermal insulation of ground floor (100 mm)

Individual heating substation

Hydraulic balancing (installation of balancing valves)

Thermal insulation of heat distribution pipes

Replacement of heating system

Installation of a rooftop PV system

Renovation Comparison Charts
Comparison Charts